We guide you through the entire process — from early feasibility and design through to factory construction and on-site installation. By managing each stage in-house, we provide clarity around cost, program and delivery, with fewer handovers and less uncertainty.
Our Forma Series is designed for efficiency, repeatability and adaptability across a range of typical site conditions. Each design is carefully resolved to streamline the process of delivering a high-quality home.
For projects that sit outside of this framework, we offer bespoke design. These homes are developed from the ground up, responding directly to your site, brief and vision. This approach allows for deeper exploration, refinement and a more tailored outcome.
Pre-Designed System
Resolved and Tested Layouts
Faster Pathway
Standardised Modular System
Cost-Optimised
Limited Variations
Fully Customised Design
Suited to Complex Sites
In-Depth Design Phase
Flexible Construction Approach
Site-Specific Design Response
Greater Spatial and Material Flexibility
Once documentation is finalised, construction takes place within our Croydon factory. Site works are undertaken concurrently with module manufacture, significantly reducing the overall program once modules are delivered.
Once feasibility is confirmed, we develop the design and manage planning approvals as required.
Design, coordination and documentation are undertaken with factory construction and installation in mind from the outset.
Every project starts with a conversation. We discuss your site, goals, budget and timing, and whether modular is the right approach. Where helpful, this may include a factory visit to better understand the process and product.
We assess planning controls, site constraints and modular suitability to confirm what’s achievable. This stage provides early clarity around scope, cost and planning pathway before moving into detailed design.
Completed modules are transported to site and installed using pre-planned cranage and sequencing.
Following installation, final connections, inspections and certification are completed. Projects are delivered through to handover with a clear scope, defined responsibilities and reduced uncertainty around timeframes.
Modular construction is not a one-size-fits-all approach.
Where it provides clear benefits — such as reduced site disruption, improved certainty or greater control over construction — it is prioritised. Where a different approach is more suitable, projects may shift toward conventional construction or a hybrid solution that combines both off-site and on-site methods.
Regardless of the pathway, all projects are delivered with the same integrated approach, ensuring consistency in design, coordination and build quality.